Internal Waterproofing – New Construction

Internal Waterproofing – New Construction : When it comes to waterproofing the foundation of high-rise buildings, there is no possibility to do the waterproofing from outside. Therefore, waterproofing should be applied on the internal retaining walls, just after the drainage mat.

We have the extensive experience in applying drainage and waterproofing for high rise and mid-rise buildings.

Please contact us for a free estimate and visit of your job site!

Planning the drainage and waterproofing

Drainage and waterproofing do different jobs. A drainage mat gives water a path to the collection system, while the waterproofing membrane forms a barrier against water entering the building. The project drawings should show where the drainage leads and how the membrane connects at corners, penetrations and the wall-to-slab junction. Sheet and liquid-applied membranes are common options, but the choice depends on the wall assembly, site conditions and project specifications. On a new build, it helps to coordinate the installation with other trades so the waterproofing can be inspected before it is covered and protected from damage during later work.

What affects the estimate and schedule?

Wall area is only one part of an estimate. The specified membrane, surface preparation, job-site access and the number of joints and penetrations all affect the work involved. The schedule also depends on when each wall section is ready, how the work is phased and whether inspections are required before the next trade can proceed. For a site visit, have the current foundation drawings, wall sections and waterproofing specifications available if possible. Flag any access restrictions and share the planned construction sequence so the scope can be reviewed against the work already scheduled.

Questions

Does a drainage mat replace the waterproofing membrane?

No. The mat directs water toward a drain; it does not provide the continuous barrier that a waterproofing membrane is designed to provide.

Which details should be resolved before installation starts?

Confirm how the membrane will be sealed around pipe penetrations, carried across joints and connected to adjoining waterproofing. These details are harder to correct once the assembly is covered.

When should waterproofing be discussed on a new build?

Review it while the foundation details and construction sequence are being finalized. That gives the project team time to coordinate drainage outlets, site access and inspection points.