External Waterproofing – New Construction : Foundation Waterproofing is a fundamental step in construction. Thanks to our waterproofing technology and our high quality products, we can expedite the waterproofing process of your property foundation.
Please contact us for free estimate and technical proposal.
What external waterproofing involves
On a new build, external waterproofing is typically installed on the soil-facing side of the foundation walls before backfilling. The wall surface is prepared first, then the waterproofing layer is installed with attention to corners, joints and places where pipes pass through the wall. Common options include sheet membranes and fluid-applied membranes. Sheet systems need properly sealed overlaps, while fluid-applied systems need continuous coverage at the specified thickness. Depending on the design, a protection board or drainage mat may be installed before backfilling.
Planning the work and comparing estimates
Foundation wall area, site access, surface preparation and the number of corners and pipe openings can all affect the price. When comparing estimates, check whether they cover the same work, including membrane protection, footing drainage and any preparation the walls need. Have the foundation drawings and proposed backfill date ready when requesting an estimate. Allow time in the schedule for surface preparation, any curing the system requires and any required inspection before the walls are covered.
Questions
Is waterproofing the same as damp-proofing?
No. Damp-proofing limits moisture from the soil, while a waterproofing system is designed to resist liquid water. The foundation design and site conditions help determine what is needed.
Does a waterproofing membrane replace footing drainage?
No. The membrane helps keep water from entering through the foundation wall, while footing drainage helps carry water away. They serve different purposes and are often used together.
Can backfilling begin as soon as the membrane is installed?
Not necessarily. The timing depends on the membrane’s installation requirements and whether protection layers or inspections must be completed first.

(905) 771 1383